Opis
Traffic light programming at Edwards Mill Rd and Laurel Hills Rd needs to be investigated.
also asked...
Q. What is the type of signal?
A. Vehicular
A. Vehicular
Q. Please describe the nature of the issue. (i.e timing, signal head twisted, etc)
A. When entering Edwards Mill Rd. from Laurel Hills Dr., the streetlight and the pedestrian signals do not operate in sync. There are times when one pedestrian signal will count down from 6 to 0, then the one on the other side of the street counts down
A. When entering Edwards Mill Rd. from Laurel Hills Dr., the streetlight and the pedestrian signals do not operate in sync. There are times when one pedestrian signal will count down from 6 to 0, then the one on the other side of the street counts down
2 Skomentujs
Potwierdzone City of Raleigh 3 (Verified Official)
Ken Colvin (Zarejestrowany użytkownik)