Opis
Route 313 starting at the intersection of route 115 all the way to the Woodbridge town line is absolutely awful. A small section was paved near the reservoir, but there is still major damage to the road along the route. It needs to be fixed.
Route 313 starting at the intersection of route 115 all the way to the Woodbridge town line is absolutely awful. A small section was paved near the reservoir, but there is still major damage to the road along the route. It needs to be fixed.
2 Skomentujs
Planner (Zarejestrowany użytkownik)
Resurfacing of RT 313 from RT 67 to the Woodbridge Town Line is scheduled for this year. Project will include milling, paving & leveling/replacement of culverts, catch basins etc.
Best guess is it will be underway or completed by late June or July.
An anonymous SeeClickFix user (Zarejestrowany użytkownik)